ROI calculator
Two calculators with your own figures. The first puts a fee per scan against a full 4-in-1 lane. The second shows what manual inspection costs you today. All figures in US dollars.
Per-scan fee or full lane
A fee per scan, against the lane that does the scanning.
CXS systems carry no per-scan fee: the software licence is perpetual and the number of scans is unlimited. Other offers charge by the scan. Put both on the same axis and see where they cross. The starting values are deliberately low: 5,000 vehicles a year at 25 dollars a scan.
Set the volume and the fee to see where a per-scan fee and a full lane cross.
- Per-scan model, running total
- Buying: purchase plus service from year two
- Per-scan model over five years
- –
- Buying over five years, with service
- –
- Cost per scan when you buy
- –
Worked example with assumed values, not a statement about the prices of any specific provider. Lane prices are the list prices in this catalogue, net, in US dollars. The support package from year two is set to the Professional level; other levels are available. In a meeting we run the numbers with your vehicle volume and the competing offer you have.
Included in every system
Bought once, scanned without a meter running.
-
Base software
Perpetual licence, included in the price of the system.
-
On-premise AI
Damage detection and analysis run on your own server; cloud is optional.
-
Licence plate recognition
Binds every scan to a vehicle without manual entry.
-
No per-scan fee
The number of scans is unlimited.
List prices are net and exclude VAT, freight, customs duties, installation, commissioning, calibration and training. Only our quotation is binding. Leasing in the UAE via GRENKE on request.
Manual inspection or lane
What does manual inspection cost you?
Put your own numbers in. The calculator works out the labour hours spent on visual inspection today, what an automated lane returns, and how long the system takes to pay for itself.
Payback period
–
- Inspection hours per year, today
- –
- Annual inspection labour cost
- –
- Annual cost with CXS
- –
- Annual saving
- –
- Total investment
- –
- Net position after 3 years
- –
- Staff hours returned per year
- –
Indicative only. The labour reduction is manufacturer-stated; freight is an indication that moves with fuel, capacity and season. Prices are EXW Shanghai in US dollars, exclusive of duty and taxes. Nothing here is a quotation.
Method
How the numbers are worked out.
-
Fee or lane
The per-scan model is vehicles per year times the fee, plus a purchase price if the offer has one. Buying is the lane at list price plus a support package from year two. Both are added up over five years. Where the two lines meet is the break-even.
-
Why the starting values are low
5,000 vehicles a year is about 20 a working day, and the purchase price in the per-scan model starts at zero. Both favour the per-scan side. Raise them to your own figures and the picture moves.
-
Where the labour figure comes from
Vehicles per day times minutes per inspection times operating days gives the yearly inspection hours. Multiplied by your fully loaded hourly cost, that is what visual inspection costs you in labour today.
-
Why 80% and not 100%
Automation removes the walk-around, not the operator. A trained person still confirms every chargeable finding and handles exceptions. The 80% is the manufacturer's stated figure, and the field is yours to lower.
-
What is deliberately left out
Better detection normally turns into recovered damage costs and fewer disputes. That is not counted unless you enter a figure yourself, because it depends on your contracts and your current recovery rate.
-
What is not included
Duty, VAT, local electrical work and any integration effort on your side. Those are set out in the quotation, not here.
Free of charge
We validate your business case on site, at our cost.
A calculator uses your estimates. Before anyone signs anything, we come to your site for a first one-to-one session and replace those estimates with measured figures: your actual cycle time, your actual vehicle mix, your actual lane layout. There is no charge and no obligation for that first meeting.
You leave the session with a deployment model built on your numbers, whether or not you buy anything.
Replace the estimates with your real numbers.
Send us the figures you entered. We come back with a configured lane, a firm quotation and a free on-site session to validate the case.
Live demonstrations at our site in Landshut, Germany.
Passenger
Passenger
Passenger
Trucks & buses